Recommendations
Pet Cremation Unit

Specifications
Top Chamber
| HEIGHT (mm): | 600 |
| WIDTH (mm): | 600 |
| DEPTH (mm): | 1,800 |
| DOOR OPENING (mm): | TBC |
Bottom Chamber
| HEIGHT (mm): | 350 |
| WIDTH (mm): | 450 |
| DEPTH (mm): | 1,500 |
| DOOR OPENING (mm): | TBC |
** Exhaust system configured to suit installation
Machine Details
Within our many years of involvement in the cremation industry Kleenburn have observed a growing need for the disposal of loved family pets in a more ecological friendly and less distressing manner than simply burying in a backyard or disposing of at a local council tip.
It is our intention and aim; to provide this service to the public at a reasonable cost and in an efficient, caring and sympathetic manner. As most pets are regarded as a member of the family, many people have asked existing Human Crematoriums to provide this service. Unfortunately, this is not legally acceptable.
In proposing to provide these services, we have considered the project from a spectator/neighbour point of view and have addressed many issues likely to cause concern and inconvenience.
Over 30 years of design, research and experience, we have developed units capable of extremely efficient disposal of such remains.
With pet disposal there are far less possible contaminants; no timber coffin, plastic lining, plastic handles or unknown packaging, as is common within the Human Cremation Industry.
Our units are designed to be aesthetically pleasing and quiet. They offer low fuel consumption and are automatically controlled.
- 1 off cremator unit with 1 main chamber and lower secondary chamber
- 2 off LPG fuelled burners or natural gas, 1 off main burner rated at 0.9 GJU/hr. 1 off secondary burner rated at 0.6 GJU/hr
- Fully automatic control with manual over-ride
- 1 off combustion blower
- 1 off exhaust fan unit
- 4 metres stainless steel stack (standard)
- Fully programmable temperature controllers. Both burners with manual over-ride control
- Post firing cool down timer
- 1.5 second fume holding (standard)
- Fully installed and commissioned (Australia wide)
- Painted enamel finish (standard) with stainless steel optional
- 2 off Ash Pans plus 2 off Rakes
Options
PLEASE NOTE: Customer to Supply the following:
- Power supply to our control panel
- Fuel supply to our isolation point on furnace
- Flue trenching (for under floor systems)
- Roof flashing around stack
- Unloading and installation requirements to be discussed
- Delivery to and Cranage on Site
- Any Approvals & Inspections from Local Authorities
** These services can be arranged by R & Y upon customer request
** Additional costs apply for delivery, cranage, loading and unloading at installation site (if required).
** These costs may vary depending on season, availability, material costs, type of unit or equipment being delivered etc.
** We allow 3 working days for Installation and Commissioning. Any delays beyond our control would be charged at our standard daily rate.