Double Cremation Unit

Specifications
| HEIGHT (mm) | 2,200 + 900 Insertion End |
| WIDTH (mm) | 3,600 |
| DEPTH (mm) | 3,200 |
| WEIGHT (kg) | 29,000 - 30,000 |
| DOOR OPENING (mm) | 1,040 |
| **Exhaust system configured to suit installation |
Machine Details
The concept behind manufacturing a Double Unit was to achieve a cleaner and more fuel efficient product.
By controlling the air flow between units, we are able to draught heat from one chamber to the next. This circulation of heat allows for a continuous loading of chambers at approximately 30 minute intervals.
Fuel cost for operation is much lower than for two single units. The cremation process is completed quickly and remains are very clean.
The design of the Double Unit requires less floor space for installation than for two single units and uses a common flue system.
- 2 off Cremator Unit with1 Main Chamber and Lower Secondary Chamber each.
- 4 off LPG or Natural Gas Fuelled Burners, 2 off Main Burner rated at 1.8 GJU/hr, 2 off Secondary Burner rated at 0.9 GJU/hr
- Fully automatic control with manual over-ride
- 1 off Combustion Blower
- 1 off Exhaust Fan Unit
- 4.5 metres Under-Floor Flue or Above Ground (standard)
- 4 metres Stainless Steel Stack (standard)
- Fully Programmable Temperature Controllers. Both Burners with manual over-ride control
- Auto Exhaust Rate Adjusting and manual over-ride
- Auto Pressure Sampling and Self Adjusting System with manual over-ride
- Post Firing Cool Down Timer
- 1.5 second Fume Holding (standard)
- Fully Installed, and Commissioned (Australia wide)
- Painted Enamel Finish (standard) with Stainless Steel optional
- 2 off Ash Pans plus 2 off Rakes
Options
PLEASE NOTE: Customer to Supply the following:
- Power supply to our control panel
- Fuel supply to our isolation point on furnace
- Flue trenching (for under floor systems)
- Roof flashing around stack
- Unloading and installation requirements to be discussed
- Delivery to and Cranage on Site
- Any Approvals & Inspections from Local Authorities
** These services can be arranged by R & Y upon customer request
** Additional costs apply for delivery, cranage, loading and unloading at installation site (if required).
** These costs may vary depending on season, availability, material costs, type of unit or equipment being delivered etc.
** We allow 3 working days for Installation and Commissioning. Any delays beyond our control would be charged at our standard daily rate.