Recommendations
Single Cremation Unit
Specifications
HEIGHT (mm) | 2,200 + 900 Insertion End |
WIDTH (mm) | 1, 750 |
DEPTH (mm) | 3,200 |
WEIGHT (kg) | 14,000 |
DOOR OPENING (mm) | 1,040 |
**Exhaust system configured to suit installation |
Machine Details
- 1 off cremator unit with 1 main chamber and lower secondary chamber
- 2 off LPG fuelled burners or natural gas, 1 off main burner rated at 1.8 GJU/hr, 1 off secondary burner rated at 0.9 GJU/hr
- Fully automatic control with manual over-ride
- 1 off combustion blower
- 1 off exhaust fan unit – stainless steel
- 4.5 metres under floor or above ground flue (standard)
- 4 metres stainless steel stack (standard)
- Fully programmable temperature controllers. Both burners with manual over-ride control
- Auto exhaust rate adjusting and manual over-ride
- Auto pressure sampling and self-adjusting system with manual over-ride
- Power insertion door
- Post firing cool down timer
- 1.5 second fume holding (standard)
- Fully installed and commissioned (Australia wide)
- Painted enamel finish (standard) with stainless steel optional
- 2 off ash pans plus 2 off rakes
Options
PLEASE NOTE: Customer to Supply the following:
- Power supply to our control panel
- Fuel supply to our isolation point on furnace
- Flue trenching (for under floor systems)
- Roof flashing around stack
- Unloading and installation requirements to be discussed
- Delivery to and Cranage on Site
- Any Approvals & Inspections from Local Authorities
** These services can be arranged by R & Y upon customer request
** Additional costs apply for delivery, cranage, loading and unloading at installation site (if required).
** These costs may vary depending on season, availability, material costs, type of unit or equipment being delivered etc.
** We allow 3 working days for Installation and Commissioning. Any delays beyond our control would be charged at our standard daily rate.